Industrial PLC Programming
We deliver industrial PLC programming — structured, reusable software built to the control standards of the major manufacturers, validated before startup.
PLC architectures validated and commissioned across automotive and process industry.
Siemens, Rockwell, Beckhoff, Mitsubishi, Schneider
Line to enterprise over OPC UA and MQTT
Logic proven against a digital twin first
What is industrial PLC programming?
Industrial PLC programming is the development of the software that controls a machine or a line: sequences, interlocks, safety, communication with robots and the operator interface. We write it on the client's platform, such as Siemens TIA Portal, Rockwell Studio 5000 or Beckhoff TwinCAT, and validate it against a digital twin before installation.
PLC software validated in a virtual environment.
Our industrial PLC programming is written, simulated and debugged against the cell model, cutting on-site commissioning time.
PLC automation for your industry.
-
Siemens TIA
Portal and standard libraries.
-
Rockwell
Studio 5000 and Logix.
-
Beckhoff
TwinCAT and PC-based control.
-
Libraries
Reusable blocks by OEM standard.
- [ Volkswagen, Audi, Seat, Skoda (VASS5, VASS6) ]
- [ BMW (L7, LU, V8, TMO3) ]
- [ Daimler (Integra Wave 6) ]
- [ Tesla ]
- [ Ford ]
- [ JLR ]
- [ Volvo ]
- [ SICAR ]
- [ GM ]
- [ Stellantis ]
What we deliver
-
PLC logic
Structured, maintainable code in the customer's chosen platform, following OEM and plant standards.
-
HMI design
Operator interfaces that make line state obvious and actions fast, built around real operator workflows.
-
SCADA configuration
Screens, alarms, trends and user management tuned to the plant's SCADA platform of choice.
-
MES & data integration
Production data, order handoff and KPI capture wired into the customer's MES or IoT stack.
-
Safety logic
Safe PLC programming, SIL validation and certification-ready documentation.
-
Virtual commissioning
Every sequence tested against a digital twin before deployment, cutting startup time and on-site risk.
The RBX Programming automated process
- Phase 01
Architecture & signals
We define the hardware, network and signal map with you.
- Phase 02
Pre-validated development
Logic, HMI and safety tested against a virtual PLC.
- Phase 03
Integration & startup
SCADA/MES connected and commissioned on the plant floor.
9 PLCs validated before a single machine was connected.
On the body-in-white line from our virtual commissioning case study, the logic of 9 PLCs coordinating 111 robots was tested against the digital twin before Power On. Sequences, interlocks and safety arrived validated, and on-site work shifted from debugging to verification. On-site commissioning hours fell from 23,058 to 13,423.
PLCs validated against the digital twin before Power On.
Weeks to full production, against 53 with the traditional model.
Validation cycles at startup, against 6.
Source: case study published on our blog (body-in-white line, US electric vehicle manufacturer). The traditional baseline is for programmes of comparable scope.
Logic tested on site versus pre-validated logic.
-
First test of the logic
Traditionally, on the real machine with the installation team waiting. Pre-validated, against a virtual PLC and the cell model.
-
Sequences and interlocks
On site they are debugged by stopping the line. In the twin, faults, stops and edge cases are forced with no risk to people or equipment.
-
Safety
On site it is checked at the end. Pre-validated, emergency stops, guarded zones and muting are tested before power-up.
-
HMI, SCADA and MES
On site they are connected at the end of the project. Pre-validated, screens, alarms and production data are tested together with the logic.
Frequently asked questions
Which PLC platforms do you work with?
Do you also handle HMI programming and SCADA integration?
How do you integrate PLCs with MES?
Can you work to our OEM or plant PLC standard?
Do you program safety logic?
What is the advantage of validating PLC programs against a digital twin?
Related articles
More on this topic from our engineering team.
-
PLC Programming PLC Optimization for Industrial Projects
PLCs are essential for industrial automation. Discover their benefits and how RBX optimizes PLC programming for reliable projects.
Read article -
Virtual Commissioning Agentic Commissioning: AI Agents for PLC and Robot Cells
Agentic Commissioning lets an AI agent test PLC logic and robot cells in Process Simulate and TIA Portal. Learn how it works and how it differs from RITMO.
Read article -
Debugging Why Is Debugging Important in Automation Projects?
Why debugging is important in industrial automation projects: it catches faults before the line runs, cuts start-up risk and saves cost. How we do it.
Read article