Design, build and certify — from the first schematic to CE marking.
Electrical engineering, cabinet manufacturing, installation and machine safety certification under one coordinated team — tightly integrated with the software and automation that will run on them.
Design, cabinet manufacturing and on-site assembly delivered under one contract.
Schematics, BoMs and changes in one environment
Marking and 61439 compliance support
Shared with PLC, robotics and VC teams
Electrical that talks to the rest of the project.
Electrical design, cabinet manufacturing, field installation and safety certification are often delivered by separate vendors. The seams are where projects slip. We keep them under a single team working alongside the PLC, robotics and virtual commissioning engineers, so the hardware and the software arrive aligned.
What we deliver
-
Electrical design
Schematics, control architecture and documentation in Eplan Electric P8, kept aligned as the project evolves.
-
Cabinet manufacturing
Custom control and power cabinets built to project need, wired and tested before shipment.
-
On-site installation
Cable routing, tray work, auxiliary structures and labelling executed by qualified field technicians.
-
Machine safety
Risk assessments, technical files, user manuals and required testing for CE marking and IEC compliance.
-
Purchasing support
Component sourcing leveraging relationships with Siemens, Schneider, Rockwell, Phoenix Contact and others.
-
Integration with controls
Electrical engineering that stays in step with the PLC, robot and VC teams: one project plan across all disciplines.
- [ Eplan Electric P8 ]
- [ Schneider (TeSys / Modicon) ]
- [ Siemens (Simatic / Sirius) ]
- [ Rockwell (Allen-Bradley) ]
- [ Phoenix Contact ]
- [ IEC 61439 ]
- [ CE marking ]
Service phases
- Phase 01
Electrical design
Architecture, schematics and documentation produced in Eplan, kept in sync with every project change.
- Phase 02
Cabinet manufacturing
Custom cabinets and protection equipment manufactured to project need and schedule, pre-tested before delivery.
- Phase 03
Installation assembly
Cable routing, channels, auxiliary structures and labelling executed by qualified technicians.
- Phase 04
Machine safety & certification
Technical files, user manuals, risk assessments and testing to support CE marking and IEC 61439 conformity.