Design, build and certify — from the first schematic to CE marking.
Electrical engineering, cabinet manufacturing, installation and machine safety certification under one coordinated team — tightly integrated with the software and automation that will run on them.
Design, cabinet manufacturing and on-site assembly delivered under one contract.
Schematics, BoMs and changes in one environment
Marking and 61439 compliance support
Shared with PLC, robotics and VC teams
What does industrial electrical engineering include?
Industrial electrical engineering covers the design of schematics and control architecture, control cabinet manufacturing, on-site installation and the machine safety documentation needed for CE marking. We deliver it as turnkey electrical engineering, in Eplan Electric P8 and coordinated with the PLC, robotics and virtual commissioning teams.
Electrical that talks to the rest of the project.
Electrical design, cabinet manufacturing, field installation and safety certification are often delivered by separate vendors. The seams are where projects slip. We keep them under a single team working alongside the PLC, robotics and virtual commissioning engineers, so the hardware and the software arrive aligned.
What we deliver
-
Electrical design
Schematics, control architecture and documentation in Eplan Electric P8, kept aligned as the project evolves.
-
Cabinet manufacturing
Custom control and power cabinets built to project need, wired and tested before shipment.
-
On-site installation
Cable routing, tray work, auxiliary structures and labelling executed by qualified field technicians.
-
Machine safety
Risk assessments, technical files, user manuals and required testing for CE marking and IEC compliance.
-
Purchasing support
Component sourcing leveraging relationships with Siemens, Schneider, Rockwell, Phoenix Contact and others.
-
Integration with controls
Electrical engineering that stays in step with the PLC, robot and VC teams: one project plan across all disciplines.
- [ Eplan Electric P8 ]
- [ Schneider (TeSys / Modicon) ]
- [ Siemens (Simatic / Sirius) ]
- [ Rockwell (Allen-Bradley) ]
- [ Phoenix Contact ]
- [ IEC 61439 ]
- [ CE marking ]
Service phases
- Phase 01
Electrical design
Architecture, schematics and documentation produced in Eplan, kept in sync with every project change.
- Phase 02
Cabinet manufacturing
Custom cabinets and protection equipment manufactured to project need and schedule, pre-tested before delivery.
- Phase 03
Installation assembly
Cable routing, channels, auxiliary structures and labelling executed by qualified technicians.
- Phase 04
Machine safety & certification
Technical files, user manuals, risk assessments and testing to support CE marking and IEC 61439 conformity.
Several suppliers versus one team.
-
Design changes
With several suppliers, every schematic change is reinterpreted at each hand-off. With one team, Eplan and the PLC program are updated on the same plan.
-
Accountability
With several suppliers, a startup fault is argued between whoever designed, built the cabinet and programmed. With one team, there is a single owner.
-
Testing
Cabinets are tested before shipping and signals are already mapped for virtual commissioning, so the wiring arrives aligned with the software.
-
Documentation
Schematics, bills of materials, technical files and manuals come out of the same environment and stay current until handover.
Frequently asked questions
Which software do you use for electrical design?
Do you handle control cabinet manufacturing?
Do you help with machine safety compliance and CE marking?
Do you carry out on-site electrical installation?
Why use the same team for electrical engineering and programming?
Related articles
More on this topic from our engineering team.
-
Virtual Commissioning Case Study: EV Manufacturer Cuts Commissioning Time in Half
A new body-shop production line reached full production in half the time. See the real numbers behind this Virtual Commissioning case study.
Read article -
Virtual Commissioning On-Site vs. Virtual Commissioning: Time and Cost
We compare on-site commissioning and virtual commissioning in robotic integration projects, focusing on real time and cost savings.
Read article -
Debugging Why Is Debugging Important in Automation Projects?
Why debugging is important in industrial automation projects: it catches faults before the line runs, cuts start-up risk and saves cost. How we do it.
Read article